Local focus Burnaby
Change location

Founder implementation case studies

See the work.
Understand the checks.

Four actual founder implementations: a saved reporting correction, verified ticket creation, a document pilot and a readiness report validated in staging.

Deer Lake & Metrotown · Burnaby

Evidence before claims

What changed.
What was checked.

These are Manish’s actual enterprise implementation projects. Each status reflects its evidence: saved correction, observed execution, completed pilot or staging build. They are not presented as paid Surrey AI Automation client engagements.

Production reporting & conversion controls

A shared input calculation replaced conflicting list and KPI definitions. Missing conversion evidence stays visible as REVIEW.

Consistentlist and KPI in the recorded saved snapshot

Saved correction · October 1, 2026

Source freshness and later report states remain outside this acceptance scope.

Read the implementation

Support intake & guarded ticket creation

A contradictory decision gate was repaired. One genuine request was traced through creation, destination read-back and queue completion.

Verified pathcreation, key, read-back and field checks

Recorded execution · October 2, 2026

Historical action statuses rechecked October 6; wider coverage remains unverified.

Read the implementation

SharePoint document governance pilot

A defined library structure and governance fields were tested with a bounded document copy while retaining the originals.

Pilot completedstructure, metadata and retained originals checked

Completed pilot · August 3, 2026

Wider migration, owner review and access validation remained expansion gates.

Read the implementation

Pre-production readiness reporting

A staging report brought component availability and shortage review into one workflow, with corrected search, reset and rounding behavior.

Staging buildrecorded model and reader checks

Validated in staging · September 29–30, 2026

Production deployment is not established; later layout and exports are not independently rechecked.

Read the implementation

A guide to the actual work

Take the cases with you.

An eight-page guide to the four documented implementations: the problem, what changed, the recorded checks and what remains unverified. Includes the two original screen excerpts and a practical first-project checklist.

Prepared October 7, 2026. 8 pages, about 170 KB. No signup. These cases document the founder's enterprise work, with dates, pilot and staging limits preserved; they do not establish paid consultancy-client engagements or measured savings.

Genuine screen excerpts

A view into
the implementation.

These are actual captures from the reporting interface and automation run. The excerpts exclude company branding, personal details, source identifiers, operational quantities and request payloads.

The case pages separate the visual evidence from the dated acceptance checks. An interface capture alone does not prove that every source, edge case or export works.

Genuine Power BI excerpt showing Production Status and Quality Gate columns with PASS and FAIL rows
Actual Power BI status-column excerpt captured October 3, 2026. Company branding, order identifiers and operational quantities are outside the captured area. This image shows the report interface; the recorded calculation check supports the results above.
Open the original screen excerpt
Genuine Power Automate run excerpt showing successful intake, evidence initialization, pending-state processing and item loading steps
Actual Power Automate run excerpt captured October 3, 2026, from the October 2 execution. It shows the intake and pending-state controls. Company identifiers, request content and action payloads are outside the captured area; creation and read-back were also checked in action-level run evidence.
Open the original screen excerpt

Explore an interaction

Try a dashboard.
Then define your own.

Our browser demonstrations use fictional data. They show a possible interaction and are separate from the implementation cases above.

A practical place to start

Bring the process
that needs a clearer result.

Discuss your workflow

Burnaby Mountain viewpoint